Location: Playa Vista, CA
Project Description: 6,800 SF Rubberway® Multi-Purpose system
Year Installed: 2014
Rubberway Multi-Purpose was installed at this new community and recreational facility built by Brookfield homes as part of the Google and YouTube campus living environment.
This custom, non-porous Rubberway Multi-Purpose system is installed on the second level of the facility and is considered a rooftop application. This system was chosen due to the ability to customize the thickness which allows it to taper off from a 1 inch thickness to 3/8 inch thickness to meet the balcony edge in order to encourage water to flow away from the building. Additional benefits include sound dampening and a high coefficient of friction making this a safe, non-slip surface.
Rubberway Multi-Purpose can be customized to varying thicknesses and porosity rates and can also be made non-porous as in this project. It can also be installed on slopes such as alongside stairs and on handicap ramps